WIND FARM WITH 24 MW TOTAL INSTALLED CAPACITY

February 2006

WIND FARM WITH 24 MW TOTAL INSTALLED CAPACITY PLACED IN MONTORSI LOCALITY IN MUNICIPALITY OF VOLTURINO (FG)

client: omissis

amount: 25.000.000 €

Environmental Impact Study

WORKS TO PROTECT A RAILWAY LINE

October 2005

WORKS TO PROTECT THE RAILWAY LINE  S.SEVERO-RODI-PESCHICI, FROM 69 KM and 69 +177 +669 Km AT CAMBOMILLA DISTRICT IN THE TOWN OF RODI GARGANICO

client: omissis

Amount:  1.300.000 €

Procedure for Environmental Impact Verification after prior screening

WORKS AT NORTH GATE OF TARANTO PORT

June 2004

WORKS FOR THE REARRANGEMENT AND THE REHABILITATION OF THE NORTH GATE OF TARANTO PORT

client:  Port Authority of Taranto

Amount: 1.112.000 €

Feasibility Environmental Study

PLANT FOR THE DISPOSAL OF HOSPITAL WASTE

Year 2011

PLANT FOR THE DISPOSAL OF HOSPITAL WASTE USING THERMODESTRUCTION AND ENERGY RECOVERY SYSTEM IN THE INDUSTRIAL DEVELOPMENT AREA OF BARI

client: omissis

Amount: 3.500.000 €

Environmental Impact Assessment

COLLECTION AND THE DISPOSAL OF INERT OR NO HAZARDOUS MATERIAL

March  2008

SELECTION PLANT FOR THE COLLECTION AND THE DISPOSAL OF INERT OR NO HAZARDOUS MATERIAL AND ENVIRONMENTAL RECOVERY OF THE QUARRY PLACED IN ACQUAVIVA DELLE FONTI MUNICIPALITY

client : omissis

Amount: 2.103.000 €

Environmental Impact Study, preliminary and final design

REALIZATION OF A MULTI-FLOOR PARKING

May 2010

REALIZATION OF A MULTI-FLOOR PARKING WITH SHOPPING CENTER AND SERVICE SECTOR STORES LOCATED AT CAPRUZZI STREET IN BARI MUNICIPALITY

Client: omissis

Preliminary report and VAS procedure verification

RESTORATION OF DUNE VEGETATION

August 2006 – October 2008

WORKS FOR THE RESTORATION OF DUNE VEGETATION AND AGAINST THE WIND EROSION IN DUNE DI CAMPOMARINO, SITE OF COMMUNITARIAN IMPORTANCE

Client:  Municipality of Maruggio (TA)

Amount:  354.137 €

Environmental impact assessment, preliminary design, final design and works supervision

VEGETABLE OIL REFINING PLANT

May 2009 – November 2011 

VEGETABLE OIL REFINING PLANT IN DUTY OF A BIOMASS POWER PLANT PLACED IN INDUSTRIAL ZONE OF MONOPOLI (BA)

Client: omissis

Amount:  5.000.000 €

Preliminary environmental study and procedure to release emissions into the atmosphere