Environmental remediation - AD.ENG.

Archive for the ‘Environmental remediation’ Category

EMEGRENCY INTERVENTIONS FOR SAFETY AND HEALTH PROTECTION

June 2006 – January2007

EMEGRENCY INTERVENTIONS FOR SAFETY AND HEALTH PROTECTION AT THE D8 BUILGING END ADJACENT TOWER IN THE FORMER FACTORY OF FIBRONIT AT CALDAROLA STREET IN CITY OF BARI

Client:  Puglia Region, Office of the Commissioner for Environmental Emergency

Amount: 426.748 €

INTERVENTIONS FOR SAFETY AND HEALTH PROTECTION

December 2009

INTERVENTIONS FOR SAFETY AND HEALTH PROTECTION AT THE SECTOR ‘’A’’ OF THE CONTROLLED LANDFILL FOR MSW IN PIANO DELL ACQUA LOCALITY IN SCALEA MUNICIPALITY (CS)

Client:      omissis

Amount:  1.200.000 €

Final design and coordination during the design phase

ENVIRONMENTAL RESTORATION AND INTERVENTIONS FOR SAFETY AND HEALTH PROTECTION

March 2007

ENVIRONMENTAL RESTORATION AND INTERVENTIONS FOR SAFETY AND HEALTH PROTECTION AT THE POLLUTED SITE OF ‘’FORMER MARRASCA LANDFILL’’ PLACED IN NOCI MUNICIPALITY (BA)

Client:    Noci Municipality (BA)

Amount:   2.142.957 €

Final design, executive design and coordination during the design phase

ASBESTOS POLLUTED SITE

ex Fibronit

September 2007 – March 2011

SAFETY MEASURES AT THE NATIONAL INTEREST SITE OF FORMER FIBRONIT, A POLLUTED FROM ASBESTOS SITE, PLACED IN CITY OF BARI

Client: Municipality of Bari

Amount: € 16.900.000

Feasibility study, preliminary and final design